KAINDL Flooring: Installation instruction
Testing the base
Vor Beginn der Verlegung muß der Verlegeuntergrund immer gründlich geprüft werden.

In principle tests should be carried out as regards
  • Humidity
  • Evenness
  • Wheight baring capacity
  • Firmness
  • Ground temperature
  • Cleanliness

Test Check
Humidity The residual values stated should not be exceeded
Evenness
  • The base must be absolutely even
  • Small areas of unevenness can be compensated with a pad
  • Floor unevenness amounting to over 3 mm/1m have to be smoothed or levelled out
Wheight baring capacity The base must have sufficient carrying capacity
Firmness The base must be absolutely firm
Ground temperature
  • at least 15 degree C
  • the maximum difference between panel and floor temperature should be +/- 3 Grad C
Cleanliness Before the floor is laid, the base must be absolutely clean and therefore it should be cleaned with a powerful industrial vacuum cleaner.