KAINDL
Flooring: Installation instruction
Testing
the base
|
Vor Beginn der Verlegung muß
der Verlegeuntergrund immer gründlich geprüft werden.
In principle tests should be carried out as regards
- Humidity
- Evenness
- Wheight baring capacity
- Firmness
- Ground temperature
- Cleanliness
Test |
Check |
Humidity |
The
residual values stated should not be exceeded |
Evenness |
- The base must be
absolutely even
- Small areas of
unevenness can be compensated with a pad
- Floor unevenness
amounting to over 3 mm/1m have to be smoothed or
levelled out
|
Wheight
baring capacity |
The
base must have sufficient carrying capacity |
Firmness |
The
base must be absolutely firm |
Ground
temperature |
- at
least 15 degree C
- the
maximum difference between panel and floor
temperature should be +/- 3 Grad C
|
Cleanliness |
Before
the floor is laid, the base must be absolutely clean and
therefore it should be cleaned with a powerful
industrial vacuum cleaner. |
|
|
|
|