Deutsche Version von KAINDL Flooring
PRODUCTS SHIFTING KAINDL-DEALERS ENVIRONMENT NEWS PORTRAIT
Installation: Instruction - Heating pipe
aktuelle Position Installation aktuelle Position Instructions aktuelle Position Laminated floors
  Product Overview

.
KAINDL Flooring
Laying instruction laminated floors

Heating pipe
   
Where, for instance, there is an obstacle such as a heating-pipe or similar obstacles, you first have to cut the panel to the right length, then place it next to the object in question, measure and draw the correct shape of the object. Again please consider the correct settlement join. The measured and cut panel should then be glued and eased into place with the pull-iron. The spacer helps to secure the position.
next: Installation of the first panel
Technical Support by:
www.i-mw.net

KAINDL FLOORING GmbH  //  www.kaindl.com.hk  //  sales@kaindl.com.hk
 
  Phone: (852) 3118-7988  //  Fax: (852) 3426-3332