Deutsche Version von KAINDL Flooring
PRODUCTS SHIFTING KAINDL-DEALERS ENVIRONMENT NEWS PORTRAIT
Installation: CCS - Clip Connection System Laying instruction
  Product Overview

.
CCS - Clip Connection System 
Laying instruction

CCS: detailled installation instruction to PRINT
 
  Installation & Function
1. Fixing the CCS-System

Fix the CCS-Clip on the positions marked on the undersides of the panels. For one whole panel you will need three CCS-Clips per longitudinal side and one clip per lateral side
2. Fixing the CCS: Longitudinal Joint
Stand the panel vertically with the tongue before the groove of the preceding row. Move the panel to within 6-10 mm of its final position to the left of the adjacent panels. Now lower the panel into position whilst applaying pressure. You should be able to feel the resilience of the CCS spring.
3. Fixing the CCS: Lateral Joint
To close the lateral joints slide the panel sideways into position (if necessary you may use the hammer and push block). You will hear when the spring of the CCS-Clip engages. The panels are now held firmly together by CCS spring tension.
Product information
Technical Support by:
www.i-mw.net

KAINDL FLOORING GmbH  //  www.kaindl.com.hk  //  sales@kaindl.com.hk
 
  Phone: (852) 3118-7988  //  Fax: (852) 3426-3332